0.6 million TPA throughput of graded silica sand. The Mine Lease area is 4.856ha. Proponent reported that 300 tonnes per day of solid waste will be generated. The low grade silica sand obtained from other mines will be used as raw material for the beneficiation plant. Proponent informed that the plant has presently obtained