Two major technical constraints involved in the determination of such schedule are: (i) the feasible combinations of ore and waste production (stripping ratio), and (ii) the ore production rate that meets the mill feed requirements. Optimization methods have long been used to improve mine design and life-of mine production schedules [1–12].