The gypsum landfill there, Jänschwalde II, has been run since 2011 in two-shift operation for the FGD gypsum from LEAG's Jänschwalde 6 x 500 MW lignite-fired power plant. The delivered gypsum is placed in the landfill by means of a rail-mounted spreader (Fig. 11) and reclaimed with a wheel-loader (Fig. 12).