
— All costs are estimated in Australian dollars and are presented as 1st quarter 2009 costs. They are estimated to have an accuracy of ±35%, which is commensurate with the accuracy requirements for a high-level options study of this nature. The details of the cost estimate can be found in McNab et all, 2009. The total capital cost was as follows: