This work directly solves the inverse kinematics of the 6R-2P drill jumbo with 2 redundant DOFs at the displacement level using θ1 and θ5 as inputs to avoid solving a nonlinear system. An approach for computing the pose of the end-effector used to drill each hole on the mine face is also proposed.